When the well head pressure going up, the drilling fluid can be pumped into well with the killing manifold in order to balance the well bottom pressure, to prevent well from kicking and blow-out; the blowout pipeline which connected to blowout directly can be used to release the well bottom pressure; to inject mud cementing operation by injecting water and extinguishing agent into the well head as well. It only can inject heavy fluid or other fluid into well by check valve, but the backflow and other operation. Killing manifold consists of check valve, gate valve, pressure gage, connection pipeline, etc. One of its ends is connected with BOP cross, the other end is connected with injection pump, both killing manifold and choke manifold are designed and mating used according to API 16C requirement.
Description |
Choke manifold |
Killing manifold |
|||||
model |
JG/S2-35 |
JG/SY-35 |
JG/SY2-70 |
JG/S2Y2-105 |
YG-35 |
YG-70 |
YG-105 |
Main ND and bypass ND in(mm) |
3 1/8×2 1/16(80×52) 4 1/16×2 9/16(103×65) 4 1/16×3 1/16(103×78) |
||||||
Working pressure psi(MPa) |
3000(21) |
3000(21) |
500(35) |
10000(70) |
15000(105) |
||
Working temperature °C(°F) |
P.U -29~121 (-20~250) |
||||||
Working medium |
Mud, oil (w/ H2S) |
||||||
Control type |
Double wing structure manual throttle valve |
Double wing structure hydraulic throttle valve |
Three-way structure hydraulic/manual throttle valve |
Four-way double hydraulic/manual throttle valve |
Double-wing structure pneumatically controlled |